Article overview: Server power supplies can reach multiple markets efficiently through the IECEE CB Scheme, built on IEC 62368-1. This guide covers the workflow, required files, cost and schedule factors, and a multi-market strategy.Anci Labsupports power brands with CB and global certification planning.

Server power supplies can reach multiple markets efficiently through the IECEE CB Scheme, built on IEC 62368-1. This guide covers the workflow, required files, cost and schedule factors, and a multi-market strategy.Anci Labsupports power brands with CB and global certification planning.

Anci Laboratory

What is the CB Scheme for server PSUs

The IECEE CB Scheme is a global system where a single CB test certificate (based on IEC 62368-1 for IT power supplies) is accepted by participating national certification bodies. A server PSU CB report can be used to obtain national marks (for example UL, CCC, KC) with reduced local testing.

Applies to server PSU, rack power modules, redundant power supplies

Key basis IEC 62368-1; IECEE CB Scheme

CB certification process

  1. 1Confirm PSU specs and target markets.
  2. 2Submit samples to a CB laboratory.
  3. 3Safety testing to IEC 62368-1.
  4. 4Compile the CB test report and technical file.
  5. 5Apply for national certifications using the CB, then tag and retain records.

Documents needed

  • CB application and product description
  • Circuit diagrams and PCB layout
  • Critical component list (capacitors, transformers)
  • CB test report
  • Manual with warnings
  • Label artwork

Cost factors

CB cost is not a single figure. It depends on PSU power rating, the number of test items, whether critical components already carry certs, and how many national marks you derive from the CB.Anci LabShare the spec sheet first for a scoped quote.

Schedule factors

Schedule depends on test scope, sample condition and document readiness. A first-pass sample with complete files keeps the timeline predictable; added testing or file updates extend it.

Multi-market strategy

A CB certificate built on IEC 62368-1 streamlines access to many markets: the US often needs UL (with a CB as input), China needs CCC, Korea needs KC, and the EU needs CE (LVD plus EMC). Plan the CB as the common base, then derive national marks.Anci Labrecommends one CB base per platform.

避坑提示:The CB report reduces but does not remove national differences (local deviations, factory inspection). Confirm each target market’s specific appendices before shipment.

Q1 What is the IECEE CB Scheme?

It is a global certification system where one CB test certificate, based on an IEC standard such as IEC 62368-1, is accepted by participating national bodies to issue local marks.

 

Q2 Does CB replace country certifications?

No. The CB report eases national certification by reducing repeat testing, but each market still issues its own mark (UL, CCC, KC, and so on) with possible local deviations.

 

Q3 Which markets accept CB?

Most major economies participate in the IECEE CB Scheme, including the US, China, Korea, Japan and EU members, though each applies its own national differences.

 

Q4 Is CB useful for a server PSU?

Yes. A server PSU CB based on IEC 62368-1 is a strong common base to derive UL, CCC, KC and CE with less duplicated testing.

 

本文内容仅供行业交流与信息参考,不构成任何形式的认证约定、检测建议或法律意见。文中涉及的认证要求、流程及标准信息可能随法规更新而变化,请以国家相关部门现行公告为准。检测认证的具体要求、周期及费用需根据实际产品由专业工程师评估确定,如有需求请致电咨询。

联系电话:18826804895 邮箱:net01@gtggroup.com

了解更多:https://www.anci.com


WeChat

二维码Scan WeChat

QQ

QQ Consulting2902506472