CE certification for open frame power supplies — PCB-mount and chassis-mount power modules supplied without enclosures — presents unique compliance challenges due to their nature as incomplete components destined for integration into finished equipment. Unlike enclosed power supplies that can be CE marked independently, open frame PSUs must be evaluated in the context of their intended end-use installation. EMC and safety testing is conducted with the power supply mounted in a representative host enclosure, and the resulting test data supports the OEM equipment manufacturer's overall CE conformity assessment. This guide provides a framework for open frame power supply CE compliance, covering the regulatory context, representative host enclosure testing methodology, critical safety distance verification, and practical strategies for supplying compliance data that enables efficient downstream OEM certification.

Open frame power supplies are classified as components under EU CE marking regulations. While they can undergo conformity assessment against the applicable directives — typically the EMC Directive (2014/30/EU) and Low Voltage Directive (2014/35/EU) — the assessment must be conducted with the PSU installed in a representative host enclosure. The concept of "reference installation conditions" is central: the PSU manufacturer defines a representative host enclosure (material, dimensions, ventilation, grounding scheme) and performs testing in that configuration. The test report documents these reference conditions, and downstream OEM integrators rely on this data as evidence contributing to their end-product CE conformity assessment.
EMC testing of open frame PSUs in a host enclosure faces two practical challenges. First, radiated emissions must be measured from the complete assembly — the enclosure's shielding effectiveness, ventilation opening pattern, and cable entry/exit points all influence the measured emission levels. Second, the enclosure material choice (metal vs. plastic) affects both shielding and grounding — a PSU tested in a metal chassis may show significantly different emissions than the same PSU in a plastic enclosure. The PSU manufacturer's test report should clearly document the reference enclosure specifications so that OEM integrators can assess compatibility with their own enclosure design. Open frame PSU reference host CE testing conducted with multiple representative enclosure types provides the most versatile compliance data for downstream integrators.
LVD safety assessment per EN 62368-1 for open frame PSUs focuses on the inherent safety of the power supply design: insulation coordination (creepage and clearance distances on the PCB), transformer construction and insulation, and protection against electric shock from accessible terminals. The critical departure from enclosed PSU certification is that the "accessible parts" determination depends on the host enclosure — exposed terminals that would be accessible in the open-frame state are assumed to be protected by the host equipment's enclosure. The open frame PSU's insulation barriers must be evaluated at the PCB level, but the overall safety assessment presumes that the host enclosure provides the final layer of protection against user contact.
For OEM equipment manufacturers integrating open frame PSUs, the compliance workflow is: obtain the PSU manufacturer's CE test reports and Declaration of Incorporation; verify that the host enclosure design is consistent with the reference installation conditions in the PSU test report; perform host-level EMC verification (typically a radiated emission scan of the complete equipment); and reference the PSU's LVD test data in the host equipment's safety technical file. Open frame PSU OEM integration CE compliance support from the PSU manufacturer facilitates efficient end-product certification for downstream customers.

Q1 Can an open frame PSU be CE marked independently?
An open frame PSU as an incomplete component cannot bear the CE marking as an end-product. The PSU manufacturer may issue a Declaration of Incorporation stating conformity with the applicable directives under reference installation conditions. The final CE marking is applied by the OEM equipment manufacturer on the complete end-product.
Q2 What information must the reference host enclosure test report contain?
The report should document: enclosure material and thickness, internal dimensions, ventilation opening sizes and locations, PSU mounting position and grounding method, input/output cable routing and termination, and the load configuration used during testing. This information enables OEM integrators to compare their host design against the reference conditions and assess compliance data applicability.
Q3 How does UL 62368-1 Recognition differ from CE for open frame PSUs?
UL Recognition is a formal component certification with defined Conditions of Acceptability — a structured framework for component integration. CE compliance for open frame PSUs is less formalized: the PSU manufacturer provides test data and a Declaration of Incorporation, but the CE conformity responsibility ultimately rests with the OEM integrator. UL Recognition provides a more prescriptive integration pathway than CE.
Q4 What additional testing does the OEM integrator need after open frame PSU integration?
At minimum, the OEM integrator should perform: a radiated emission scan of the complete equipment (to verify that the integrated EMC performance remains within limits); a touch current measurement of the complete equipment; and a review of the safety insulation distances to confirm that the host enclosure provides the assumed protection. If the host enclosure differs significantly from the reference installation, additional testing may be required.
Q5 Can open frame PSU CE and UL testing be combined into a single program?
Yes. The core safety tests — temperature rise, dielectric strength, and fault testing — share common methodology under EN 62368-1 and UL 62368-1. Open frame PSU combined CE and UL safety testing conducted in a representative host enclosure generates data for both regulatory frameworks from a single test campaign.
This content is provided for industry communication and informational reference only and does not constitute any form of certification commitment, testing advice, or legal opinion. The certification requirements, procedures, and standards referenced herein may change as regulations evolve — please refer to the latest official announcements from the relevant authorities. Specific certification requirements, timelines, and costs must be evaluated by professional engineers based on the actual product. For inquiries, please contact us by phone.